Construction of System for Wastewater Collection

Summary

The project is the development, design, financing, procurement and construction of a wastewater treatment plant (WWTP) in Phan Rang – Thap Cham City, Ninh Thuan.

Location

Ninh Thuan Province

Sector

Water

Applicant

Ministry of Planning and Investment (MPI)

Competent Authority

The Management and Capacity Development Unit of Water Resource and Public Service (MCDU)

Parties Involved

Royal Haskoning DHV

Project number

ORIO11/VN/01

Total project cost / Total ORIO Grant amount

23,900,000 Euro / 6,838,993 Euro

Status project

Implementation phase

Located in the South Central Cost region of Vietnam, Phan Rang - Thap Cham is the economic and administrative capital of the province of Ninh Thuan. Presently, Phan Rang city has a population of 170,000 people. Most households currently use septic tanks, but these often overflow into the ground and when emptied, the effluent is dumped untreated into nearby lakes and river or dumpsites causing serious pollution of ground water and surface water. The discharge of untreated wastewater from SMEs worsens the situation.

In the current situation, about 60,000 people and 200 SMEs (situated in some critical areas of the city centre with very poor sanitation conditions) are connected to a sewage system, linked to a 5,000 m3/day wastewater treatment plant.
  • The project concerns the development, design, financing, procurement and construction of a wastewater treatment plant with a capacity of 10,000 m3/day, including tertiary (household connections), secondary and primary collection networks in the city, and subsequent operation and maintenance of the installations and training of staff. The cleaned wastewater will be used for irrigation purposes.
  • The present project aims to connect an additional 125,000 households and 300 SMEs to a wastewater collection network while the wastewater of these connections will be treated in a wastewater treatment plant with a capacity of 10,000 m3/day. The project is physically separated from the before mentioned system presently under construction. After project implementation 100 percent of the population of the Phan Rang - Thap Cham city will be connected to a system for sewerage and wastewater treatment.

Bent u tevreden over deze pagina?

Verplichte velden zijn gemarkeerd met een *
Als wij vragen hebben over uw toelichting, mogen wij dan contact met u opnemen?
Mogen wij u benaderen voor een gebruikersonderzoek?
Wij zoeken regelmatig respondenten voor gebruikersonderzoek op onze website. Wij zijn benieuwd naar uw mening en gaan graag met u in gesprek. Een online interview duurt maximaal 45 minuten.